Project Gallery

Nassau Cruise Port

Builder

TMC Engineering Ltd.

Industry

Recreational

Project Size

5400sf

Completion Date

December 2021

Project Gallery

View the process of our build.

Project Details

Nassau Cruise Port

Overview

This hot-rolled hybrid structure was designed as a fast-build temporary building to accommodate the special protocols needed for cruise line boarding during Covid-19. The building is open to the elements and designed to be reusable.

Phase I

The building was installed in 2021. After the pandemic, the building was a multi-use facility hosting open-air meetings, small concerts, Junkanoo parades, and more.

The Results

In December 2022, the building was dismantled and relocated to allow the new port of Nassau facility to continue construction.

Project Details

Products used in the build:

Main/Primary Frame
Lorem ipsum dolor sit amet, consectetur adipiscing elit.
Roofing
Secondary Frame

Ready to Build?